Saturday 19 April 2014

Draft Working Drawings

Two days earlier than expected our builder sent us through the draft working drawings through on Tuesday. Overall I am pretty happy with them - there is things missing/wrong but all in all minor things. The list is up to about 25 things but most of them are queries or small changes like

There is 2 issues that need to be sorted

1. The side second frontage fence is installed by the developed which we have known. Its a timber 1.8m fence that the real estate told us would come up to basically in line with the ensuite/garage. The contract actually states that it can only cover 50% of the second frontage unless its dropped to 1.2m in height. Our conveyancer is putting a request into the developer to see if we can get it extended to 2/3 or 3/4 of the house. The bold line is the proposed fence just so you know what I'm talking about.



Conveyancer has put a request into Walker to get the fence line extended to the 3/4 or 2/3 mark up the side of the house.

2. The ensuite/WIR/BIR of the main bedroom.
This was the original design:


We changed it to maximise the BIR space but caused an issue with the door of the bedroom and ensuite. This is what we changed it to:



But are having issue with the doors and I don't really think we are gaining all that much except a big ensuite? Thoughts ideas? Which do you prefer/which one is the most practical?